IKIDS CHILD CARE SANDRINGHAM
About Project
The structural concrete package included a 1,000 m2 of basement slab, 1000 m2 of suspended slab, and a 1000 m2 Bondek slab. Our scope included detailed and bulk excavation, reinforcement, formwork, and concrete.
